  • 無塵室設計淨化車間的裝修布置有哪些?
    來源:http://www.relexus.com 瀏覽: 發布日期:2020-12-10
    一、無塵室(淨化車間)建築位置選擇
    1、 locations selection of clean room (purification workshop)
    無塵室(淨化車間)位置的選擇,應根據需要、經濟等比較後確定 ,應盡量選擇在大氣含塵濃度較低,自然環境較好的區域;應遠離鐵路、碼頭、飛機場、 交通要道以及散發大量粉塵和有害體的工廠、貯倉等有嚴重空氣汙染、振動或噪聲幹擾的區域;應布置在廠區內環境清潔、人流貨流不穿越或少穿越的地段,還有潔淨廠房頻率風向上風側有煙囪時,潔淨廠房與煙囪之間的水平距離不宜小於煙囪高度的12倍,潔潔廠房與交通幹道之間的距離不宜小於50米。
    The locations of the dust-free room (purification workshop) should be determined according to the needs and economic comparison. It should be selected in the area with low dust concentration and good natural environment as far as possible; it should be far away from railway, wharf, airport, traffic artery, factories and warehouses which emit a large amount of dust and harmful substances, which have serious air pollution, vibration or noise interference; It should be arranged in the area where the environment is clean, the flow of people and goods does not cross or less pass through, and when there is a chimney on the windward side of the maximum frequency wind direction of the clean workshop, the horizontal distance between the clean workshop and the chimney should not be less than 12 times the height of the chimney, and the distance between the cleaning workshop and the traffic trunk road should not be less than 50m.
    二、無塵室(淨化車間)的平麵布局
    2、 Plane layout of clean room (purification workshop)
    無塵室一般包括潔淨區、準潔淨區和輔助區這三大部分。
    Clean room generally includes clean area, quasi clean area and auxiliary area.
    無塵室的平麵布置可以有以下幾種方式:
    The layout of the clean room can be arranged in the following ways:
    兩端式:潔淨區設在一邊,另一邊設準潔淨和輔助用房。
    Two end type: the clean area is set on one side, and the other side is provided with clean and auxiliary rooms.
    內配式:無塵車間設在外圍,而走廊設在內部,這種走廊的潔淨度級別一般都較高,甚至和無塵車間同級
    Internal matching: the dust-free workshop is located in the periphery, while the corridor is located in the interior. The cleanliness level of this corridor is generally higher, even at the same level as the dust-free workshop
    核心式:為了節約用地、縮短管線,可以潔淨區為核心,上下左右被各種輔助用房和隱蔽管道的空間包圍起來,這種方式避開室外氣候對潔淨區的影響, 減少了冷熱能耗,利於節能。
    Core type: in order to save land and shorten pipelines, the clean area can be taken as the core, surrounded by various auxiliary rooms and concealed pipelines. This way avoids the influence of outdoor climate on the clean area, reduces the cold and hot energy consumption and is conducive to energy saving.
    外環繞式:外可以有窗和無窗,兼作參觀和放置一些設備用,有的在外廊內設值班采暖,外窗必須是雙層密封窗
    External surround type: the outside can have windows or no windows, which can be used for visiting and placing some equipment. Some of them are equipped with on duty heating in the veranda, and the outer windows must be double sealed windows
    無塵室(淨化車間)彩鋼板裝修注意事項
    Precautions for decoration of color steel plate in dust free room (purification workshop)
    1、吊頂飾麵的材質、品種、規格等,應符台設計要求,並對產品性能進行核對。
    1. The material, variety and specification of ceiling finish shall meet the design requirements, and the product performance shall be checked.
    2、吊頂工程中的預埋件、鋼筋吊杆和型鋼吊杆應進行防鏽或防腐處理;當吊頂上部作為靜壓箱時,預埋件與樓板或牆體的銜接處,均應進行密封處理。支吊架應采取防塵處理。
    2. The embedded parts, reinforcement suspenders and section steel suspenders in the ceiling engineering shall be treated with anti rust or anti-corrosion treatment; when the upper part of the ceiling is used as a static pressure box, the joints between the embedded parts and the floor or wall shall be sealed. Supports and hangers shall be dustproof.
    3、吊頂的標高、尺寸、起拱、板間縫隙應符合設計要求。板間縫隙應一致,每條板間縫隙誤差不得大於0.5 ;並以密封膠均勻密封,做到平整、光滑、略低於板麵,不得有間斷和雜質。
    實驗室裝修
    3. The elevation, size, arch camber and gap between slabs of ceiling shall meet the design requirements. The gap between plates shall be consistent, and the gap error between each plate shall not be greater than 0.5; and the sealant shall be used to seal evenly to make it flat and smooth, slightly lower than the plate surface, and there shall be no discontinuities and impurities.
    4、吊頂工程的檢驗批,應按潔淨室(區)麵積500劃分為- -個檢驗批,不足500也應劃分為一-個檢驗批。
    4. The inspection lot of ceiling works shall be divided into one inspection lot according to the area of clean room (area) of 500, and one inspection lot of less than 500.
    5、安裝龍骨前,應按設計要求對房間淨高、洞標高和吊頂內管道、設備及其它支架的標高等辦理工序交接手續。
    5. Before installing the keel, the process handover procedures shall be handled according to the design requirements for the net height of the room, the elevation of the hole and the elevation of the pipes, equipment and other supports in the ceiling.
    6、空氣過濾器、燈具煙感探測器、揚聲器和各類管線穿吊頂處的洞]周圍應平整、 嚴密、清潔,並用不燃密封材料封堵。隱蔽工程的檢修口周邊應采用密封墊密封。
    6. Air filter, lamp smoke detector, loudspeakers and holes where all kinds of pipelines pass through the ceiling shall be flat, tight and clean, and sealed with non combustible sealing materials. Sealing gasket shall be used for sealing around the manhole of concealed works.
    7、吊頂的固定和吊掛件,應與主體結構相聯。 不得與設備支架和管線支 架聯接;吊頂的吊掛件亦不能用作管線支 吊架或設備的支吊架。
    7. The fixing and hanging parts of the ceiling should be connected with the main structure. It is also not allowed to be used as the support or hanger of the equipment or the hanger of the equipment.