  • 手術室潔淨車間對裝修裝飾的要求
    來源:http://www.relexus.com 瀏覽: 發布日期:2020-12-16
    在潔淨車間中,例如手術室的裝飾的主要是表麵材料易於安裝,易於清潔並且易於滿足清潔要求,有利於保持室內溫濕度,減輕空調係統負擔。要避免由靜電引起的揮發性麻醉藥品或各種氣體爆炸、著火等危險。潔淨車間中,要防止對醫護人員產生視覺幹擾,並要考慮材料在施工中的適用性和可行性。
    In the clean workshop, such as the operating room, the main focus of decoration is that the surface material is easy to install, easy to clean and easy to meet the cleaning requirements, which is conducive to maintaining indoor temperature and humidity and reducing the burden of air conditioning system. It is necessary to avoid explosion and fire of volatile narcotic drugs or gases caused by static electricity. In the clean workshop, it is necessary to prevent visual interference to medical staff and consider the applicability and feasibility of materials in construction.
    1.手術室等潔淨房間牆麵、頂棚做法
    1. Wall and ceiling practices of clean rooms such as operating room
    手術室的牆壁由壁形的鋼骨架組成,包括C形槽龍骨,垂直主龍骨,水平龍骨,垂直輔助龍骨和頂部龍骨等,均由冷彎薄壁C形鋼加工而成。潔淨車間中,牆體、頂棚型鋼龍骨構件和牆麵板按設計在工廠加工並完成預拚裝,然後分類編號並運至施工現場。
    The wall of operating room is composed of wall-shaped steel framework, including C-shaped groove keel, vertical main keel, horizontal keel, vertical auxiliary keel and top keel, all of which are processed by cold-formed thin-walled C-shaped steel. In the clean workshop, the wall, ceiling steel keel components and wall panel are processed and pre assembled in the factory according to the design, and then classified and numbered and transported to the construction site.
    空氣淨化工程
    2.牆板安裝
    2. Wall panel installation
    1)在潔淨車間中安裝C形地槽(沿地龍骨),按地麵龍骨控製線用膨脹螺栓把龍骨固定在地麵上。
    1) C-shaped floor trough (along the ground keel) is installed in the clean workshop, and the keel is fixed on the ground with expansion bolt according to the control line of ground keel.
    2)檢查牆龍骨的位置後,將單麵牆的龍骨骨架組裝到地麵上。潔淨車間中,牆體的垂直主龍骨通過螺栓與水平龍骨和頂部龍骨連接,擰緊所有螺栓完成單麵牆體骨架拚裝。
    2) After checking the position of the wall keel, assemble the keel framework of the single wall to the ground. In the clean workshop, the vertical main keel of the wall is connected with the horizontal keel and the top keel by bolts. Finally, all bolts are tightened to complete the single wall framework assembly.
    3)使用對角撐杆進行臨時固定,然後使用L形和“-”形連接器將牆骨固定在C形地龍骨上,按次序擰緊連接螺栓形成一個四周封閉的整體骨架。潔淨車間中,當牆體整體骨架安裝並校正後,用角鐵斜撐固定,斜撐的一端焊接在牆體沿頂龍骨上,另一端焊接在頂板的預埋鐵件上。每麵牆體至少保證有3個固定點。焊點部位要及時作防鏽處理。
    3) The diagonal braces are used for temporary fixation, and then L-shaped and "- shaped connectors are used to fix the wall bone on the C-shaped ground keel. Finally, the connecting bolts are tightened in order to form an overall framework which is closed around. In the clean workshop, when the overall framework of the wall is installed and corrected, it is fixed with angle iron diagonal brace. One end of the diagonal brace is welded on the top keel of the wall, and the other end is welded on the embedded iron parts of the roof. At least 3 fixed points shall be guaranteed for each wall. Anti rust treatment shall be carried out in time for the welding spot.
    此外,麵板從上到下懸掛,同一塊牆板懸掛在兩個主龍骨上。潔淨工程中,每個麵板的兩側不超過主龍骨的線,牆麵板的接縫為2mm。兩板采用點焊方法連接,每條縫隙5~6個焊點,間距約500mm。焊點部位要及時作防鏽處理。
    In addition, the panel is suspended from top to bottom, and the same wall panel is suspended on two main keels. In clean Engineering, both sides of each panel shall not exceed the center line of main keel, and the joint of wall panel shall be 2mm. The two plates are connected by spot welding, each gap has 5-6 welding points, and the spacing is about 500mm. Anti rust treatment shall be carried out in time for the welding spot.
    以上就是今天小編為大家介紹關於空氣淨化工程的相關的資訊,您可以及時的關注榴莲视频app下载地址的網址:http://www.relexus.com查詢了解更多的詳情谘詢,榴莲视频app下载入口會有更多的精彩內容為您呈現.
    The above is the information about air purification project. You can pay attention to our website: http://www.relexus.com Inquiry for more details, we will have more wonderful content for you